A major infrastructure project aimed at expanding Jeddah’s sewage and wastewater system in
line with Saudi Arabia’s urban development strategy. Overseen by the National Water Company
(NWC), this initiative improves the transport of wastewater from key areas in central-eastern and
northern Jeddah to the city’s main treatment facility, boosting efficiency and capacity for future
urban growth.

– Location: Jeddah, Saudi Arabia
– Duration: 2021-2023
– Client: Saudi National Water Company (NWC)
– Contract Value: 195 Million SR
– Tunnel Diameter: 3,500 mm (3.5 meters)
– Total Length: 1 km
– Tunnel Sections: 3 separate tunnels
– Shaft Upgrades: 5 shafts (55 meters depth)
– New Shaft Construction: 1 shaft (60 meters depth)

Key Features:
Advanced Micro-Tunneling System for Maximum Efficiency:
• Deep launch shafts excavated to deploy tunneling equipment.
• Laser-guided MTBM used for precise underground tunneling.
• Pipe jacking technique installs precast pipes behind the TBM.
• Reception shafts constructed for secure MTBM retrieval.

Improved Infrastructure & Urban Development:
• Expands sewage capacity to meet Jeddah’s population needs.
• Minimizes surface disruption and protects environment.
• Safely tunnels under Al Haramain Train without interference.
• Enhances drainage for better flood control and wastewater flow.